Groundwater dewatering
Design and implement dewatering systems with consideration of site and neighboring building stability.
Engineering services · ElSherif Consultancy Company
Facing groundwater in an excavation and need a suitable dewatering system?
Our projects and partners span Egypt.
Review of groundwater and soil data, system selection and operating and monitoring requirements as agreed.
Design and implement dewatering systems with consideration of site and neighboring building stability.
Review of groundwater and soil data, system selection and operating and monitoring requirements as agreed.
Water and excavation levels, soil report, boundaries, adjacent structures and discharge route.
Permeability, drawdown, excavation area, duration and discharge.
Review project objectives and agree the scope before work begins.
Review the findings and recommendations with the engineering team.
Review of groundwater and soil data, system selection and operating and monitoring requirements as agreed.
Permeability, drawdown, excavation area, duration and discharge.
Drawdown can change effective stresses and settlement; the effects and monitoring requirements must be assessed for the site.
Yes. We coordinate services nationwide according to the location and project requirements.
Water and excavation levels, soil report, boundaries, adjacent structures and discharge route.
Engineering experience since 1988
Talk to our engineering team about your project requirements.